The Republic of Uzbekistan received financing from the World Bank towards the cost of the Regional Roads Development Project. The Implementing Agency for the Project is the Road Fund under the Cabinet of Ministers. The World Bank finances part of the rehabilitation of 212 km of roads in Tashkent region, including structure renewal and the rehabilitation of ancillary road connections such as crossroads, access roads and drainage systems. The Project also supports the integration of road safety considerations into the design and implementation of the project road sections, with a view to mainstreaming these practices across all project roads.
The civil works consist mainly of rehabilitation works that bring the selected road sections and bridges up to Uzbekistan’s design standards and meet projected transport demand. They are classified as current repairs (milling, overlay and minor levelling) or capital repairs (replacement of asphalt and underlying aggregate, re-working and compaction of earthworks). The works also include widening of the carriageway with shoulders and footpaths, drainage improvements, minor alignment improvements and asphalt concrete surfacing.
AMEC, together with lead partner IRD Engineering (Italy), supervised the road rehabilitation works against technical specifications based on Uzbekistan’s national norms and standards (ShNK, GOST, UzRST, VSN and others). Acting as the “Engineer” under the FIDIC MDB contract conditions (2010 edition), the team administered the construction contracts. It made sure that the contract clauses on quality and specifications were complied with and that the works were built in line with the construction contracts.
The overall objective of the services was to ensure high-quality construction, carried out in full compliance with the engineering design and the technical specifications of the civil works contracts, and to ensure that contractors made every effort to finish within the agreed price and schedule.
The specific objectives of the assignment were to: